{"id":670065,"date":"2026-01-06T17:16:04","date_gmt":"2026-01-06T17:16:04","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=670065"},"modified":"2026-01-06T17:16:04","modified_gmt":"2026-01-06T17:16:04","slug":"elcen-dupa-interventia-in-cazul-avariei-de-la-cet-bucuresti-sud-o-mare-parte-din-apa-care-pleaca-din-cet-se-pierde-in-pamant-prin-conductele-vechi-ale-termoenergetica","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=670065","title":{"rendered":"ELCEN, dup\u0103 interven\u021bia \u00een cazul avariei de la CET Bucure\u0219ti Sud: \u201eO mare parte din apa care pleac\u0103 din CET se pierde \u00een p\u0103m\u00e2nt prin conductele vechi ale Termoenergetica\u201d"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/01\/elcen-dupa-interventia-in-cazul-avariei-de-la-cet-bucuresti-sud-o-mare-parte-din-apa-care-pleaca-din-cet-se-pierde-in-pamant-prin-conductele-vechi-ale-termoenergetica.jpg\" class=\"ff-og-image-inserted\"><\/div>\n<p id=\"p-0\">ELCEN a informat mar\u021bi dup\u0103-amiz\u0103, \u00eentr-un document detaliat remis presei, c\u0103 interven\u021bia tehnic\u0103 asupra cazanului de abur nr. 4 din cadrul CET Bucure\u0219ti Sud a fost finalizat\u0103, iar echipamentul a fost readus \u00een func\u021biune \u00een condi\u021bii de siguran\u021b\u0103, conform procedurilor tehnice \u00een vigoare.<\/p>\n<p id=\"p-1\">Avaria s-a produs duminic\u0103 diminea\u021ba la CET Sud, iar <a href=\"https:\/\/www.mediafax.ro\/social\/avarie-in-capitala-mii-de-bucuresteni-fara-apa-si-caldura-cand-se-va-relua-livrarea-agentului-termic-23664043\">furnizarea apei calde \u0219i c\u0103ldurii<\/a> a fost afectat\u0103 \u00een mai multe sectoare din Capital\u0103, dup\u0103 cum a anun\u021bat Termoenergetica. La scurt timp, ELCEN a transmis c\u0103,la ora 6.50, \u201es-a produs declan\u0219area cazanului de abur nr 4 \u00een incinta CET Bucure\u0219ti Sud, ca urmare a evolu\u021biei fisur\u0103rii unei \u021bevi aflate sub supraveghere tehnic\u0103 de c\u00e2teva zile. Acest incident a condus la oprirea turbinei cu abur nr 4 aferente acestui cazan\u201d. Potrivit declara\u021biilor <a href=\"https:\/\/www.mediafax.ro\/social\/avarie-in-capitala-reactia-elcen-cazanul-nr-4-de-la-cet-bucuresti-sud-s-a-oprit-reparatiile-se-pot-face-dupa-racirea-cazanului-ce-va-dura-3-zile-23666531\">oficialilor ELCEN<\/a>, interven\u021biile tehnice puteau fi f\u0103cute doar dup\u0103 r\u0103cirea complet\u0103 a cazanului, motiv pentru care durata estimat\u0103 a indisponibilit\u0103\u021bii este de aproximativ trei zile.<\/p>\n<h2 id=\"chapter-0\">\u201eO situa\u021bie gestionat\u0103 \u00een limitele de siguran\u021b\u0103\u201d<\/h2>\n<p id=\"p-2\">ELCEN precizeaz\u0103 c\u0103 incidentul tehnic recent nu a reprezentat o avarie major\u0103, ci o situa\u021bie gestionat\u0103 \u00een limitele de siguran\u021b\u0103 ale unui sistem energetic vechi, aflat sub o presiune tehnic\u0103 ridicat\u0103.<\/p>\n<p id=\"p-3\">Potrivit companiei, pe durata indisponibilit\u0103\u021bii temporare a acestui grup energetic, ELCEN nu a \u00eentrerupt niciun moment livrarea agentului termic c\u0103tre re\u021beaua de termoficare. CET Bucure\u0219ti Sud a func\u021bionat \u00een permanen\u021b\u0103 cu cazanul de abur nr. 3, turbina de abur nr. 3 \u0219i dou\u0103 cazane de ap\u0103 fierbinte, asigur\u00e2nd continuitatea produc\u021biei de energie termic\u0103.<\/p>\n<p id=\"p-4\">\u201eCa urmare a acestei configura\u021bii, temperatura agentului termic livrat de ELCEN a fost mai redus\u0103 dec\u00e2t nivelul solicitat de operatorul re\u021belei de termoficare-Termoenergetica. \u00cen consecin\u021b\u0103, temperatura cu care a ajuns apa \u00een calorifere sau la robinetele din locuin\u021be a fost mai sc\u0103zut\u0103, \u00eens\u0103 f\u0103r\u0103 impact major asupra consumatorilor, din prisma activit\u0103\u021bii ELCEN. Totu\u0219i, facem urm\u0103toarea precizare important\u0103: <a href=\"https:\/\/www.mediafax.ro\/economic\/in-ce-stadiu-e-remedierea-avariei-de-la-cet-sud-adrian-tudora-elcen-nu-este-o-problema-tehnica-izolata-si-nici-un-accident-singular-este-rezultatul-unui-sistem-subfinantat-23666895\">ELCEN livreaz\u0103 agentul termic p\u00e2n\u0103 la limita centralei<\/a>, de unde acesta este preluat \u0219i distribuit c\u0103tre consumatori de Termoenergetica\u201d, au transmis oficialii produc\u0103torului de energie termic\u0103.<\/p>\n<p id=\"p-5\">Reprezentan\u021biii companiei subliniaz\u0103 c\u0103 apa cald\u0103 \u201epredat\u0103\u201d distribuitorulu se pierde par\u021bial, ceea ce afecteaz\u0103 produsul final primit de consumatori.<\/p>\n<blockquote readability=\"13\">\n<p id=\"p-6\">\u201eMare parte din apa care pleac\u0103 din CET se pierde \u00een p\u0103m\u00e2nt prin conductele vechi ale Termoenergetica. Aceste pierderi afecteaz\u0103 furnizarea agentului termic la consumatori. Dac\u0103 agentul termic livrat de ELCEN chiar \u0219i la temperaturi mai sc\u0103zute ar fi distribuit de Termoenergetica exact a\u0219a cum \u00eel prime\u0219te, disconfortul termic resim\u021bit la consumatori nu ar fi unul major. \u00cen acest context, este important de subliniat c\u0103 eventualele zone \u00een care furnizarea c\u0103ldurii sau a apei calde a fost sau este \u00eenc\u0103 sistat\u0103, nu au nicio leg\u0103tur\u0103 cu activitatea ELCEN, ci \u021bin de func\u021bionarea \u0219i starea re\u021belei de termoficare operat\u0103 de Termoenergetica\u201d, au precizat oficialii ELCEN.<\/p>\n<\/blockquote>\n<h2 id=\"chapter-1\">C\u00e2t\u0103 ap\u0103 este livrat\u0103 din CET-uri \u00een locul celei pierdute \u00een sol<\/h2>\n<p id=\"p-7\">Oficialii ELCEN detaliaz\u0103 \u00een documentul transmis c\u0103 exploatarea instala\u021biilor din CET Bucure\u0219ti Sud se desf\u0103\u0219oar\u0103 \u00een prezent \u00eentr-un context tehnic dificil, influen\u021bat \u0219i de regimurile hidraulice din sistemul de termoficare operat de Termoenergetica, ce impun un regim de operare diferit fa\u021b\u0103 de parametrii normali de exploatare \u00een CET.<\/p>\n<p id=\"p-8\">Astfel, spun ace\u0219tia, fa\u021b\u0103 de perioada similar\u0103 a anului trecut, CET Bucure\u0219ti Sud func\u021bioneaz\u0103 cu un debit de ap\u0103 de adaos semnificativ mai mare, dublu peste nivelurile uzuale.<\/p>\n<blockquote readability=\"14\">\n<p id=\"p-9\">\u201eMen\u021bion\u0103m c\u0103 ELCEN este nevoit\u0103 in continuare sa furnizeze ap\u0103 de adaos din toate centralele sale pentru a suplini pierderile din re\u021beaua de termoficare. Concret, adaosul de ap\u0103 livrat de ELCEN este determinat \u00een mod direct de starea tehnic\u0103 a re\u021belei de termoficare care prezint\u0103 pierderi din cauza coroziunii, a fisurilor \u0219i avariilor frecvente. \u00cen acest moment, valorile cantita\u021bilor de ap\u0103 de adaos livrate \u00een sistem din CET-urile ELCEN, \u00een locul apei care se scurge \u00een p\u0103m\u00e2nt, sunt de peste 2000 t\/h\u201d, au subliniat reprezentan\u021bii companiei.<\/p>\n<\/blockquote>\n<p id=\"p-10\">Potrivit companiei, men\u021binerea pe termen lung a acestui regim de func\u021bionare afecteaz\u0103 instala\u021biile ELCEN, care sunt astfel obligate s\u0103 opereze \u00een condi\u021bii anormale, \u0219i conduce la deterior\u0103ri ireversibile ale echipamentelor energetice, cu impact major asupra siguran\u021bei \u0219i continuit\u0103\u021bii produc\u021biei de energie termic\u0103.<\/p>\n<h2 id=\"chapter-2\">\u201eSiguran\u021ba aliment\u0103rii cu energie nu poate fi sus\u021binut\u0103 pe termen lung f\u0103r\u0103 un cadru financiar func\u021bional \u0219i predictibil\u201d<\/h2>\n<p id=\"p-11\">\u00cen acest context, oficialii amintesc de pl\u0103\u021bile \u00eent\u00e2rziate. Potrivit facturilor afi\u0219ate pe site-ul companiei, <a href=\"https:\/\/www.elcen.ro\/\" target=\"_blank\" rel=\"noopener\">soldul neachitat<\/a> la data de 29.12.2025, la nivelul livrat \u00een ianuarie 2025, este de 108.562.746,44 de lei.<\/p>\n<blockquote readability=\"15\">\n<p id=\"p-12\">\u201eEchipamentele din CET Bucure\u0219ti Sud func\u021bioneaz\u0103 de peste 50\u201360 de ani, iar men\u021binerea lor \u00een exploatare este rezultatul eforturilor continue ale speciali\u0219tilor ELCEN, \u00een condi\u021biile unei subfinan\u021b\u0103ri \u00eendelungate. Datoria acumulat\u0103 de Termoenergetica fa\u021b\u0103 de ELCEN, de aproximativ 1,5 miliarde lei, pune o presiune economic\u0103 major\u0103 asupra companiei \u0219i afecteaz\u0103 capacitatea de a sus\u021bine mentenan\u021ba, investi\u021biile \u0219i plata furnizorilor\u201d, spun reprezentan\u021bii ELCEN.<\/p>\n<\/blockquote>\n<p id=\"p-13\">Potrivit companiei, lipsa investi\u021biilor majore realizate la timp a condus la inexisten\u021ba unor capacit\u0103\u021bi de rezerv\u0103 care s\u0103 poat\u0103 prelua imediat produc\u021bia \u00een cazul indisponibiliz\u0103rii temporare a unui grup energetic.<\/p>\n<p id=\"p-14\">\u201eAceast\u0103 vulnerabilitate este o consecin\u021b\u0103 direct\u0103 a subfinan\u021b\u0103rii cronice a sistemului \u0219i a \u00eent\u00e2rzierii programelor de modernizare. At\u00e2t timp c\u00e2t sistemul energetic func\u021bioneaz\u0103 cu echipamente foarte vechi \u0219i f\u0103r\u0103 moderniz\u0103ri majore, riscurile repet\u0103rii unor astfel de incidente tehnice nu pot fi eliminate complet. De aceea, investi\u021biile \u00een modernizarea centralelor sunt esen\u021biale\u201d, a tramsmis compania.<\/p>\n<p id=\"p-15\">\u00cen acest context, ELCEN face apel la mai mare siguran\u021b\u0103 \u0219i predictibilitate a finan\u021b\u0103rii.<\/p>\n<blockquote readability=\"13\">\n<p id=\"p-16\">\u201eOrice disfunc\u021bionalitate \u00een lan\u021bul de aprovizionare sau presiune suplimentar\u0103 asupra resurselor financiare poate genera riscuri opera\u021bionale care nu \u021bin exclusiv de ELCEN, ci de \u00eentregul ecosistem al serviciului public de termoficare. De aceea, siguran\u021ba aliment\u0103rii cu energie nu poate fi sus\u021binut\u0103 pe termen lung f\u0103r\u0103 un cadru financiar func\u021bional \u0219i predictibil, care s\u0103 permit\u0103 plata la timp a furnizorilor, men\u021binerea personalului calificat \u0219i realizarea lucr\u0103rilor de mentenan\u021b\u0103 \u0219i de investi\u021bii\u201d, au conchis oficialii companiei.<\/p>\n<\/blockquote>\n<h2 id=\"chapter-3\">\u201eCea mai mare central\u0103 de acest tip din Rom\u00e2nia\u201d<\/h2>\n<p id=\"p-17\">CTE Bucure\u015fti Sud a fost pus\u0103 \u00een func\u0163iune \u00een 1964 \u0219i este cea mai mare central\u0103 de acest tip din Rom\u00e2nia \u015fi chiar din sud-estul Europei, av\u00e2nd o putere electric\u0103 instalat\u0103 de 200 MW \u015fi o putere termic\u0103 instalat\u0103 de 530 Gcal\/h, potrivit datelor oficiale de pe site-ul companiei.<\/p>\n<p id=\"p-18\">ELCEN este cel mai mare produc\u0103tor de energie termic\u0103 din Rom\u00e2nia (40%) \u015fi este principalul furnizor de agent termic pentru sistemul de termoficare din Bucure\u0219ti (90%), cu o cot\u0103 de pia\u021b\u0103 de energie electric\u0103 livrat\u0103 \u00een re\u021bele la nivel na\u021bional de aproximativ 4%, potrivit datelor publice. Compania asigur\u0103 c\u0103ldur\u0103 \u00een sistem centralizat pentru aproximativ 550.000 de apartamente din Capital\u0103 \u0219i 5,3% din energia electric\u0103 produs\u0103 la nivel na\u021bional.<\/p>\n<p id=\"p-19\">Ministerul Energiei este cel care are \u00een subordonare ELCEN, proprietar al CET-urilor, \u00een timp ce Termoenergetica este o companie a Prim\u0103riei Municipiului Bucure\u0219ti. ELCEN, la care Ministerul Energiei de\u021bine 97,51% din ac\u0163iuni, al\u0103turi de SNGN Romgaz (2,49%), este proprietarul celor patru termocentrale \u00een Bucure\u015fti, cu o putere electric\u0103 instalat\u0103 de 636,25 MW \u0219i puterea termic\u0103 de 4.375,25 Gcal\/h, respectiv CET Vest, CET Sud, CET Groz\u0103ve\u0219ti \u0219i CET Progresu.<\/p>\n<p id=\"p-20\">Termoenergetica, succesoarea RADET, este, din 1 decembrie 2019, operatorul regional al serviciului public de alimentare cu energie termic\u0103 \u00een arealul deservit de Asocia\u0163ia de Dezvoltare Intercomunitar\u0103 Termoenergetic\u0103 Bucure\u015fti\u2013Ilfov \u0219i are \u00een exploatare sistemul de transport \u015fi distribu\u0163ie (954,09 km conducte \u2013 re\u0163ele termice primare \u0219i 2.963,3 km conducte \u2013 re\u0163ele termice secundare), pe l\u00e2ng\u0103 alte peste 1.000 de puncte termice, sta\u0163ii centralizatoare sau centrale termice de cvartal.<\/p>\n<p id=\"p-21\">&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ELCEN a informat mar\u021bi dup\u0103-amiz\u0103, \u00eentr-un document detaliat remis presei, c\u0103 interven\u021bia tehnic\u0103 asupra cazanului de abur nr. 4 din cadrul CET Bucure\u0219ti Sud a fost finalizat\u0103, iar echipamentul a &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=670065\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":670066,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/670065"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=670065"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/670065\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/670066"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=670065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=670065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=670065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}