{"id":673962,"date":"2026-01-29T11:27:03","date_gmt":"2026-01-29T11:27:03","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=673962"},"modified":"2026-01-29T11:27:03","modified_gmt":"2026-01-29T11:27:03","slug":"moment-esential-toti-cei-120-de-km-ai-drumului-expres-arad-oradea-acoperiti-de-contracte","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=673962","title":{"rendered":"Moment esen\u021bial. To\u021bi cei 120 de km ai Drumului Expres Arad \u2013 Oradea, acoperi\u021bi de contracte"},"content":{"rendered":"<div class=\"xdj266r x14z9mp xat24cr x1lziwak x1vvkbs x126k92a\" readability=\"8\">\n<p>\u201eContracte semnate pentru construc\u021bia \u00eentregului Drum Expres Arad-Oradea (120,47 km)!<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"9\">\n<p>Am semnat ast\u0103zi contractul pentru execu\u021bia Lotului 3 (47,07 km) al acestui drum expres strategic pentru Rom\u00e2nia.<\/p>\n<div dir=\"auto\" readability=\"6\">\n<div id=\"attachment_23678446\" class=\"wp-caption aligncenter\" readability=\"7\"><img aria-describedby=\"caption-attachment-23678446\" class=\"wp-image-23678446 size-full\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/01\/moment-esential-toti-cei-120-de-km-ai-drumului-expres-arad-oradea-acoperiti-de-contracte.webp\" alt width=\"700\" height=\"466\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/01\/moment-esential-toti-cei-120-de-km-ai-drumului-expres-arad-oradea-acoperiti-de-contracte-1.webp 500w, https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/01\/moment-esential-toti-cei-120-de-km-ai-drumului-expres-arad-oradea-acoperiti-de-contracte.webp 728w\"><\/p>\n<p id=\"caption-attachment-23678446\" class=\"wp-caption-text\">Foto: Cristian Pistol \/ Facebook<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"10\">\n<p>Este un moment esen\u021bial, care marcheaz\u0103 faptul c\u0103 \u00eentreaga conexiune de mare vitez\u0103 dintre Arad \u0219i Oradea este acum acoperit\u0103 de contracte de execu\u021bie\u201d, transmite Pistol.<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"10\">\n<p>Constructorul turc (NUROL \u0130NSAAT VE T\u0130CARET ANON\u0130M S\u0130RKET\u0130) are la dispozi\u021bie 2,85 miliarde de lei (f\u0103r\u0103 TVA) \u0219i 24 de luni pentru finalizarea lucr\u0103rilor prev\u0103zute \u00een acest contract de execu\u021bie (FIDIC Ro\u0219u).<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"12\">\n<p>Finan\u021bat prin Programul Transport (PT) 2021-2027, proiectul include construc\u021bia a 29 de structuri, printre care se remarc\u0103 pasajul de la km 108+925 (peste CF \u0219i DJ709B), cu o lungime de 592 de metri.<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"9\">\n<p>Drumul Expres Arad-Oradea este parte integrant\u0103 din coridorul rutier european strategic care va asigura conexiunea dintre Marea Baltic\u0103, Marea Neagr\u0103 \u0219i Marea Egee.<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"23\">\n<h2 dir=\"auto\" id=\"chapter-0\">Acest nou drum de mare vitez\u0103 este compus din 3 loturi:<\/h2>\n<p>\u2013 Lotul 1 (33,7 km), la care se adaug\u0103 drumul de leg\u0103tur\u0103 la DN 79 \u2013 Salonta (5,3 km). Contract semnat \u00een data de 28 mai 2025.<\/p>\n<p>\u2013 Lotul 2 (39,7 km), la care se adaug\u0103 drumul de leg\u0103tur\u0103 p\u00e2n\u0103 la grani\u021ba cu Ungaria (10 km). Contract semnat \u00een data de 23 septembrie 2025.<\/p>\n<p>\u2013 Lotul 3 (47,07 km), la care se adaug\u0103 drumul de leg\u0103tur\u0103 cu zona industrial\u0103 Arad Vest (2,9 km). Contract semnat ast\u0103zi, 29 ianuarie 2026.<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\">\n<div dir=\"auto\" readability=\"11\">\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"9\">\n<div dir=\"auto\" readability=\"13\">\n<p>Anun\u021bul lui Ciprian \u0218erban, ministrul Transporturilor<\/p>\n<p id=\"p-0\">\u201eUn nou contract, lansat \u00een mandatul de ministru al Transporturilor al lui <span class=\"html-span xdj266r x14z9mp xat24cr x1lziwak xexx8yu xyri2b x18d9i69 x1c1uobl x1hl2dhg x16tdsg8 x1vvkbs\"><span class=\"xt0psk2\"><span class=\"xjp7ctv\">Sorin Grindeanu<\/span><\/span><\/span>, a intrat \u00een linie dreapt\u0103.<\/p>\n<\/div>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"9\">\n<p>CNAIR a semnat, ast\u0103zi, contractul pentru construc\u021bia lotului 3 al Drumului Expres Arad-Oradea.<\/p>\n<\/div>\n<div class=\"x14z9mp xat24cr x1lziwak x1vvkbs xtlvy1s x126k92a\" readability=\"13\">\n<p>Acest contract a fost semnat cu firma turceasc\u0103 NUROL, valoarea contractului este de 2,8 mld lei (f\u0103r\u0103 TVA), durata de execu\u021bie a lucr\u0103rilor este de 24 de luni, obiectiv de investi\u021bii finan\u021bat prin Programul Transport 2021-2027\u201d.<\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u201eContracte semnate pentru construc\u021bia \u00eentregului Drum Expres Arad-Oradea (120,47 km)! Am semnat ast\u0103zi contractul pentru execu\u021bia Lotului 3 (47,07 km) al acestui drum expres strategic pentru Rom\u00e2nia. Foto: Cristian Pistol &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=673962\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":673963,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/673962"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=673962"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/673962\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/673963"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=673962"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=673962"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=673962"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}