{"id":683840,"date":"2026-03-25T11:46:04","date_gmt":"2026-03-25T11:46:04","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=683840"},"modified":"2026-03-25T11:46:04","modified_gmt":"2026-03-25T11:46:04","slug":"pista-nr-1-a-aeroportului-otopeni-modernizata-complet-dupa-31-de-ani","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=683840","title":{"rendered":"Pista nr. 1 a Aeroportului Otopeni, modernizat\u0103 complet dup\u0103 31 de ani"},"content":{"rendered":"<div><img decoding=\"async\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/03\/pista-nr-1-a-aeroportului-otopeni-modernizata-complet-dupa-31-de-ani.jpg\" class=\"ff-og-image-inserted\"><\/div>\n<p id=\"p-0\">Compania Na\u021bional\u0103 Aeroporturi Bucure\u0219ti (CNAB) a primit din partea unor mari firme interna\u021bionale de inginerie \u0219i construc\u021bii un num\u0103r de 12 oferte de participare la licita\u021bia organizat\u0103 pentru modernizarea Pistei nr. 1 de decolare\/aterizare a Aeroportului Interna\u021bional \u201eHenri Coand\u0103\u201d.<\/p>\n<p id=\"p-1\">Aceast\u0103 lucrare de amploare marcheaz\u0103 un pas decisiv \u00een modernizarea infrastructurii aviatice din Rom\u00e2nia, fiind cel mai important proiect de investi\u021bii din istoria Aeroportului Otopeni. Prin acest proiect, CNAB continu\u0103 modernizarea \u0219i extinderea capacit\u0103\u021bii de operare a Aeroportului \u201eHenri Coand\u0103\u201d, aliniind infrastructura la cele mai exigente standarde interna\u021bionale \u00een domeniul avia\u021biei.<\/p>\n<p id=\"p-2\">Proiectul prevede refacerea integral\u0103 \u0219i modernizarea Pistei 08R-26L a Aeroportului Interna\u021bional \u201eHenri Coand\u0103\u201d Bucure\u0219ti, construirea a 5 noi c\u0103i de rulare a aeronavelor, modernizarea a dou\u0103 c\u0103i de rulare existente, \u00eenlocuirea integral\u0103 a instala\u021biilor de balizaj ale pistei \u0219i c\u0103ilor de rulare, modernizarea magistralelor de cabluri subterane care alimenteaz\u0103 balizajul, reconfigurarea zonei de siguran\u021b\u0103 la pist\u0103, reloc\u0103ri ale drumului perimetral etc.<\/p>\n<p id=\"p-3\">Valoarea estimat\u0103 a contractului este de aproximativ 106 milioane de euro, finan\u021barea va fi asigurat\u0103 din fonduri proprii ale Companiei Na\u021bionale Aeroporturi Bucure\u0219ti. Durata prev\u0103zut\u0103 pentru execu\u021bia lucr\u0103rilor este de maximum 16 luni, iar cea pentru proiectare este de 9 luni.<\/p>\n<p id=\"p-4\">Ultima modernizare capital\u0103 a Pistei nr. 1 a avut loc \u00een urm\u0103 cu 31 de ani, \u00een 1994. De atunci, pentru desf\u0103\u0219urarea \u00een siguran\u021b\u0103 a traficului aerian pe Aeroportul \u201eHenri Coand\u0103\u201d, pista a fost reparat\u0103 \u00een anul 2017, \u00een perioada mandatului anterior al actualului director general CNAB, Bogdan M\u00eendrescu.<\/p>\n<h2 id=\"chapter-0\">Participan\u021bii la licita\u021bie:<\/h2>\n<p id=\"p-5\">1. FCC Construccion SA \u2013 participare individual\u0103, cu ter\u021b Prointec \u0219i subcontractan\u021bi Consis Proiect, UTI Construction and Facility Management, SC Bill Construct SRL;<br \/>2. Strabag \u2013 participare individual\u0103, cu subcontractan\u021bi Metrans Engineering, Straco Holding, 3TI Progetti Italia \u2013 Ingegneria Integrata SPA, TIAB, Studio Corona SRL Civil Engineering;<br \/>3. PORR Construct \u2013 participare individual\u0103, cu subcontractan\u021bi Artera Proiect, TIAB, Via Design SRL;<br \/>4. Asocierea format\u0103 din BOG\u2019ART (lider), Avtomagistrali, Aduro, Bitumina Gmbh Bulgaria EOOD \u0219i ter\u021bii\/subcontractan\u021bii Dito Solutions, Specialist Smart Group, Magal Security Sisteme, Artera Blue, Drum Concept, Steerforth Consult, Specialist Consulting SRL, Eurocerad International, Mithras Build, Aduro, Oyl Company Holding SRL;<br \/>5. Asocierea format\u0103 din Leviathan Design \u0219i Ubitech Construc\u021bii SRL \u0219i ter\u021bii\/subcontractan\u021bii Lagan Aviation and Infrastructure Limited, Smart Infrastructure Solutions SRL, SC Proiect-Construct Regiunea Transilvania, East Water Drillings, Total Road, Mithras Build, Aerochrom;<br \/>6. Asocierea format\u0103 din Makyol Insaat Sanayi Turizm ve Ticaret AS, CBI Construc\u021bii, Turism &amp; Investi\u021bii \u0219i ter\u021bii\/subcontractan\u021bii Elektra Invest, SR Green Group, Mega Muhendislik Mu\u0219avirlik A\u0218;<br \/>7. Asocierea format\u0103 din Swietelsky Construct, Viarom Construct, Swietelsky Magyarorszag Kft \u0219i ter\u021bii\/subcontractan\u021bii Electroproiect, Swietelsky AG, Artera Proiect, Via Design SRL, UTI Construction and Facility Management, Bemel AG, Drumserv;<br \/>8. Asocierea format\u0103 din FAR Foundation, Eurocogen D\u00e2mbovi\u021ba, Automagistral-Pivden \u0219i ter\u021bii\/subcontractan\u021bii Real Automatic SRL, Deloitte Tax, Automagistral Pivden SRL, Quadrante Proiectare \u0219i Consultan\u021b\u0103, Primacons Group SRL, 77 Construction USA Corp;<br \/>9. Asocierea format\u0103 din Precon Transilvania, Citadina 98, Lemacons, Drum Asfalt \u0219i ter\u021bii\/subcontractan\u021bii TIAB, Selina, EPC \u2013 Consultan\u021b\u0103 de Mediu, Imobiliare Construc\u021bii Montaj, BS Recycling, Artera Proiect, Via Design;<br \/>10. Asocierea format\u0103 din Concelex, Dimex-2000 Company, Road Soil, X-Way Infrastructure \u0219i ter\u021bii\/subcontractan\u021bii OPR Asphalt, Via Design SRL, UTI Construction and Facility Management, Artera Proiect;<br \/>11. Asocierea format\u0103 din Construc\u021bii Erba\u0219u, EN Electric Proiect Office \u0219i ter\u021bii\/subcontractan\u021bii TIAB, Vahostav, Magal Security Sisteme, Erba\u0219u Total Construct, Primacons Group SRL;<br \/>12. Asocierea format\u0103 din Acvatot, Coni, Gott Strasse \u0219i ter\u021bii\/subcontractan\u021bii Artera Proiect, Via Design SRL, Profal Industry, TIAB.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania Na\u021bional\u0103 Aeroporturi Bucure\u0219ti (CNAB) a primit din partea unor mari firme interna\u021bionale de inginerie \u0219i construc\u021bii un num\u0103r de 12 oferte de participare la licita\u021bia organizat\u0103 pentru modernizarea Pistei &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=683840\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":683841,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/683840"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=683840"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/683840\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/683841"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=683840"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=683840"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=683840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}