{"id":708027,"date":"2026-08-13T11:47:03","date_gmt":"2026-08-13T11:47:03","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=708027"},"modified":"2026-08-13T11:47:03","modified_gmt":"2026-08-13T11:47:03","slug":"romania-a-depasit-tinta-pnrr-pentru-fabricile-de-reciclare-12-instalatii-au-fost-finalizate-fata-de-9-asumate-anuntul-dianei-buzoianu","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=708027","title":{"rendered":"Rom\u00e2nia a dep\u0103\u0219it \u021binta PNRR pentru fabricile de reciclare: 12 instala\u021bii au fost finalizate, fa\u021b\u0103 de 9 asumate. Anun\u021bul Dianei Buzoianu"},"content":{"rendered":"<div class=\"sgb-google-buttons\">\n<div class=\"display-flex justify-center google-logo\"><img decoding=\"async\" loading=\"lazy\" class=\"mg-x-auto\" width=\"30\" height=\"30\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/romania-a-depasit-tinta-pnrr-pentru-fabricile-de-reciclare-12-instalatii-au-fost-finalizate-fata-de-9-asumate-anuntul-dianei-buzoianu.png\" alt><\/div>\n<\/p><\/div>\n<p data-start=\"115\" data-end=\"421\" id=\"p-0\">Rom\u00e2nia a dep\u0103\u0219it \u021binta stabilit\u0103 prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) privind dezvoltarea capacit\u0103\u021bilor de reciclare. Ministerul Mediului, Apelor \u0219i P\u0103durilor a anun\u021bat joi c\u0103 au fost finalizate 12 instala\u021bii de reciclare, \u00een condi\u021biile \u00een care \u021binta actual\u0103 din PNRR era de cel pu\u021bin 9.<\/p>\n<p data-start=\"423\" data-end=\"603\" id=\"p-1\">Potrivit unui comunicat transmis de minister, Rom\u00e2nia a ajuns la 133% din obiectivul asumat. Finan\u021barea \u0219i finalizarea investi\u021biilor au fost coordonate de Administra\u021bia Fondului pentru Mediu.<\/p>\n<p data-start=\"605\" data-end=\"834\" id=\"p-2\">Ministra Mediului, Diana Buzoianu, a spus c\u0103 investi\u021biile sunt importante pentru a cre\u0219te capacitatea Rom\u00e2niei \u00een ceea ce prive\u0219te reciclarea de\u0219eurilor \u0219i sc\u0103derea cantit\u0103\u021bii de materiale care ajung la depozitare.<\/p>\n<p data-start=\"605\" data-end=\"834\" id=\"p-3\">\u201eRom\u00e2nia are nevoie de capacit\u0103\u021bi reale de reciclare, aici, \u00een \u021bar\u0103. Cele 12 fabrici finalizate \u00eenseamn\u0103 mai pu\u021bine de\u0219euri trimise la depozitare, mai multe materiale reintegrate \u00een economie \u0219i investi\u021bii care creeaz\u0103 locuri de munc\u0103. Am dep\u0103\u0219it \u021binta asumat\u0103 prin PNRR, dar acest rezultat trebuie s\u0103 fie doar un punct de plecare. Rom\u00e2nia recicleaz\u0103 \u00een continuare prea pu\u021bin, iar dezvoltarea infrastructurii trebuie \u00eenso\u021bit\u0103 de colectare separat\u0103, trasabilitate \u0219i informarea corect\u0103 a popula\u021biei\u201d, a declarat Diana Buzoianu.<\/p>\n<h2 data-section-id=\"15qe8v4\" data-start=\"1363\" data-end=\"1413\" id=\"chapter-0\">Ce de\u0219euri pot fi reciclate \u00een noile instala\u021bii<\/h2>\n<p data-start=\"1415\" data-end=\"1586\" id=\"p-4\">Cele 12 instala\u021bii finalizate permit reciclarea mai multor tipuri de de\u0219euri. Plasticul, sticla, textilele, metalele neferoase \u0219i anvelopele uzate sunt printre cele enumerate de Ministerul Mediului.<\/p>\n<p data-start=\"1588\" data-end=\"1850\" id=\"p-5\">Noile capacit\u0103\u021bi pot procesa de\u0219euri provenite din construc\u021bii \u0219i demol\u0103ri. Investi\u021biile urm\u0103resc, de fapt, recuperarea \u0219i reintegrarea \u00een economie a unor cantit\u0103\u021bi mai mari de materiale care, \u00een lipsa acestor instala\u021bii, ar putea ajunge la depozitare.<\/p>\n<p data-start=\"1588\" data-end=\"1850\" id=\"p-6\">Pentru programul finan\u021bat ini\u021bial prin PNRR au fost semnate, \u00een aprilie 2025, 26 de contracte, cu o valoare total\u0103 de aproximativ 670 de milioane de lei.<\/p>\n<p data-start=\"1588\" data-end=\"1850\" id=\"p-7\">Ministerul Mediului spune \u00eens\u0103 c\u0103 num\u0103rul contractelor semnate reprezint\u0103 portofoliul ini\u021bial al investi\u021biei \u0219i nu trebuie confundat cu \u021binta revizuit\u0103 din PNRR sau cu num\u0103rul instala\u021biilor care au fost deja finalizate.<\/p>\n<h2 data-section-id=\"bygwhe\" data-start=\"2232\" data-end=\"2291\" id=\"chapter-1\">Unele proiecte au fost preluate prin Fondul pentru Mediu<\/h2>\n<p data-start=\"2293\" data-end=\"2557\" id=\"p-8\">\u00cen urma revizuirii PNRR, finan\u021barea pentru 13 dintre contractele ini\u021biale, \u00een valoare total\u0103 de peste 312,5 milioane de lei, a fost preluat\u0103 din bugetul Fondului pentru Mediu. M\u0103sura \u00eenseamn\u0103 c\u0103 pot fi continuate proiectele care fuseser\u0103 incluse ini\u021bial \u00een programul PNRR.<\/p>\n<p data-start=\"2559\" data-end=\"2740\" id=\"p-9\">Aceste investi\u021bii sunt realizate \u00een 12 jude\u021be: Bra\u0219ov, Buz\u0103u, Giurgiu, Boto\u0219ani, D\u00e2mbovi\u021ba, Covasna, C\u0103l\u0103ra\u0219i, Ia\u0219i, unde sunt dou\u0103 proiecte, Maramure\u0219, Constan\u021ba, Suceava \u0219i Neam\u021b.<\/p>\n<p data-start=\"2742\" data-end=\"2931\" id=\"p-10\">\u00cen paralel cu investi\u021bia finan\u021bat\u0103 ini\u021bial prin PNRR, Administra\u021bia Fondului pentru Mediu sus\u021bine dezvoltarea infrastructurii de reciclare \u0219i prin programul na\u021bional \u201eFabrici de reciclare\u201d.<\/p>\n<p data-start=\"2742\" data-end=\"2931\" id=\"p-11\">\u00cen cadrul acestuia sunt finan\u021bate 16 contracte, cu o valoare total\u0103 de peste 271,3 milioane de lei.<\/p>\n<p data-start=\"3034\" data-end=\"3240\" id=\"p-12\">Proiectele sunt implementate \u00een 13 jude\u021be: Maramure\u0219, D\u00e2mbovi\u021ba, unde sunt dou\u0103 proiecte, Suceava, Neam\u021b, Buz\u0103u, Prahova, cu trei proiecte, V\u00e2lcea, Harghita, Dolj, Giurgiu, Constan\u021ba, Teleorman \u0219i Ialomi\u021ba.<\/p>\n<h2 data-section-id=\"y1smpi\" data-start=\"3242\" data-end=\"3282\" id=\"chapter-2\">Investi\u021bii de sute de milioane de lei<\/h2>\n<p data-start=\"3284\" data-end=\"3567\" id=\"p-13\">Potrivit Ministerului Mediului, proiectele finan\u021bate prin aceste programe includ mai multe activit\u0103\u021bi din industria recicl\u0103rii. Recuperarea materialelor reciclabile sortate \u0219i fabricarea de produse din plastic, sticl\u0103, metale, materiale textile \u0219i cauciuc sunt c\u00e2teva dintre cele enumerate.<\/p>\n<p data-start=\"3686\" data-end=\"3972\" id=\"p-14\">\u00cen cadrul schemei ini\u021biale de finan\u021bare, un beneficiar putea primi \u00eentre 500.000 de euro \u0219i maximum 8,4 milioane de euro pentru fiecare proiect. Intensitatea \u201esprijinului a putut ajunge p\u00e2n\u0103 la 75% din cheltuielile eligibile\u201d, \u00een func\u021bie de regiunea \u00een care este realizat\u0103 investi\u021bia.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rom\u00e2nia a dep\u0103\u0219it \u021binta stabilit\u0103 prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) privind dezvoltarea capacit\u0103\u021bilor de reciclare. Ministerul Mediului, Apelor \u0219i P\u0103durilor a anun\u021bat joi c\u0103 au fost finalizate &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=708027\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":708028,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/708027"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=708027"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/708027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/708028"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=708027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=708027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=708027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}