{"id":708247,"date":"2026-08-14T17:36:03","date_gmt":"2026-08-14T17:36:03","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=708247"},"modified":"2026-08-14T17:36:03","modified_gmt":"2026-08-14T17:36:03","slug":"ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=708247","title":{"rendered":"Ministerul Energiei anun\u021b\u0103 c\u0103 \u021bintele asumate prin PNRR \u201eau fost \u00eendeplinite \u0219i chiar dep\u0103\u0219ite\u201d. Ce se arat\u0103 \u00een situa\u021bia pl\u0103\u021bilor"},"content":{"rendered":"<div class=\"sgb-google-buttons\">\n<div class=\"display-flex justify-center google-logo\"><img decoding=\"async\" loading=\"lazy\" class=\"mg-x-auto\" width=\"30\" height=\"30\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor.png\" alt><\/div>\n<\/p><\/div>\n<p id=\"p-0\">Vineri, Ministerul Energiei a prezentat situa\u021bia actualizat\u0103 a pl\u0103\u021bilor efectuate c\u0103tre beneficiarii proiectelor finan\u021bate prin PNRR \u0219i a cererilor de plat\u0103 \u00een curs de procesare.<\/p>\n<p id=\"p-1\">Potrivit Ministerului, valoarea pl\u0103\u021bilor efectuate \u00een anul 2026 este de 209 milioane de euro.<\/p>\n<p id=\"p-2\">\u00cen intervalul 10 \u2013 14 august 2026, au fost efectuate pl\u0103\u021bi \u00een valoare de 19,41 milioane de euro&nbsp;\u0219i au fost autorizate 15 cereri de transfer, cu o valoare total\u0103 de&nbsp;12,51 milioane de euro.<\/p>\n<p id=\"p-3\">\u00cen total, pl\u0103\u021bile cumulate c\u0103tre beneficiari de la \u00eenceputul programului a dep\u0103\u0219it 420 milioane de euro.<\/p>\n<p id=\"p-4\">De asemenea, a transmis c\u0103 sunt 42 de cereri de transfer \u00een curs de procesare, \u00een valoare de aproximativ 81,57 milioane de euro.<\/p>\n<h2 id=\"chapter-0\"><strong>Structura cererilor de transfer \u00een curs de procesare, pe anul \u0219i trimestrul depunerii cererii<\/strong><\/h2>\n<p id=\"p-5\">Anul 2025 \u2013 total: 37,12 mil. euro \u2013 16 &nbsp;dosare<\/p>\n<ul>\n<li>Trimestrul 2 2025: 0,72 mil. euro \u2013 2 dosare<\/li>\n<li>Trimestrul 3 2025: 24,57 mil. euro \u2013 9 dosare<\/li>\n<li>Trimestrul 4 2025: 11,83 mil. euro \u2013 5 dosare<\/li>\n<\/ul>\n<p id=\"p-6\">Anul 2026 \u2013 total: aproximativ 44,44 mil. euro \u2013 26 dosare<\/p>\n<ul>\n<li>Trimestrul 1 2026: 14,11 mil. euro \u2013 5 dosare<\/li>\n<li>Trimestrul 2 2026:&nbsp; 8,16 mil. euro \u2013 12 dosare<\/li>\n<li>Trimestrul 3 2026:&nbsp; 22,18 mil. euro \u2013 9 dosare<\/li>\n<\/ul>\n<div id=\"attachment_23790721\" class=\"wp-caption alignnone\" readability=\"32\"><img aria-describedby=\"caption-attachment-23790721\" class=\"wp-image-23790721 size-full\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor.webp\" alt width=\"900\" height=\"417\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor-2.webp 500w, https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor.webp 728w\"><\/p>\n<p id=\"caption-attachment-23790721\" class=\"wp-caption-text\">Sursa foto: Ministerul Energiei<\/p>\n<\/div>\n<div id=\"attachment_23790722\" class=\"wp-caption alignnone\" readability=\"32\"><img aria-describedby=\"caption-attachment-23790722\" class=\"wp-image-23790722 size-full\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor-1.webp\" alt width=\"900\" height=\"403\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor-3.webp 500w, https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/ministerul-energiei-anunta-ca-tintele-asumate-prin-pnrr-au-fost-indeplinite-si-chiar-depasite-ce-se-arata-in-situatia-platilor-1.webp 728w\"><\/p>\n<p id=\"caption-attachment-23790722\" class=\"wp-caption-text\">Sursa foto: Ministerul Energiei<\/p>\n<\/div>\n<p id=\"p-7\">Potrivit Ministerului Energiei, \u201eimplementarea proiectelor finan\u021bate prin PNRR \u00eenregistreaz\u0103 o evolu\u021bie concret\u0103. La nivel institu\u021bional, sunt asumate \u021binte clare, cu accent pe deblocarea \u0219i eficientizarea fluxurilor de plat\u0103, astfel \u00eenc\u00e2t fondurile disponibile s\u0103 fie valorificate \u00een termen \u0219i cu impact real asupra proiectelor aflate \u00een implementare. \u00cen acest sens, au fost luate m\u0103suri privind prelungirea termenelor de implementare a proiectelor, pentru a beneficia de \u00eentreaga perioad\u0103 de eligibilitate prev\u0103zut\u0103 \u00een Regulamentul (UE) 2021\/241\u201d.<\/p>\n<p id=\"p-8\">\u201eToate vizitele de monitorizare pentru proiectele cu cereri de transfer au fost finalizate. De asemenea, autorizarea cererilor de transfer este efectuat\u0103 \u0219i \u00een baza notific\u0103rilor de punere sub tensiune, etap\u0103 \u00een care investi\u021biile finan\u021bate prin PNRR sunt considerate finalizate\u201d, mai transmite Ministerul.<\/p>\n<p id=\"p-9\">Totodat\u0103, \u00ee\u0219i reafirm\u0103 \u201eangajamentul de a asigura procesarea cu celeritate a cererilor de transfer \u0219i de a sprijini beneficiarii \u00een implementarea proiectelor finan\u021bate prin PNRR. Ritmul sus\u021binut al pl\u0103\u021bilor \u0219i progresul \u00eenregistrat confirm\u0103 avansul investi\u021biilor din sectorul energetic \u0219i contribuie la accelerarea procesului de modernizare \u0219i tranzi\u021bie energetic\u0103 a Rom\u00e2niei\u201d.<\/p>\n<p id=\"p-10\">Mai mult, \u201eanun\u021b\u0103 c\u0103 \u021bintele asumate prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) privind dezvoltarea de noi capacit\u0103\u021bi de producere \u0219i stocare a energiei, instalate \u0219i racordate la re\u021beaua electric\u0103, precum \u0219i cele referitoare la cre\u0219terea eficien\u021bei energetice \u00een sectorul industrial, au fost \u00eendeplinite \u0219i chiar dep\u0103\u0219ite\u201d, a conchis Ministerul Energiei.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vineri, Ministerul Energiei a prezentat situa\u021bia actualizat\u0103 a pl\u0103\u021bilor efectuate c\u0103tre beneficiarii proiectelor finan\u021bate prin PNRR \u0219i a cererilor de plat\u0103 \u00een curs de procesare. Potrivit Ministerului, valoarea pl\u0103\u021bilor efectuate &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=708247\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":708248,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/708247"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=708247"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/708247\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/708248"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=708247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=708247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=708247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}