{"id":709153,"date":"2026-08-20T10:07:02","date_gmt":"2026-08-20T10:07:02","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=709153"},"modified":"2026-08-20T10:07:02","modified_gmt":"2026-08-20T10:07:02","slug":"guvernul-a-aprobat-contractul-cfr-pentru-perioada-2026-2030-cum-va-fi-finantata-infrastructura-feroviara","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=709153","title":{"rendered":"Guvernul a aprobat contractul CFR pentru perioada 2026-2030. Cum va fi finan\u021bat\u0103 infrastructura feroviar\u0103"},"content":{"rendered":"<div readability=\"46.39173553719\">\n<div class=\"sgb-google-buttons\">\n<div class=\"display-flex justify-center google-logo\"><img decoding=\"async\" loading=\"lazy\" class=\"mg-x-auto\" width=\"30\" height=\"30\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/guvernul-a-aprobat-contractul-cfr-pentru-perioada-2026-2030-cum-va-fi-finantata-infrastructura-feroviara.png\" alt><\/div>\n<\/p><\/div>\n<p id=\"p-0\">Contractul stabile\u0219te obliga\u021biile asumate de CFR SA \u0219i de Ministerul Transporturilor \u0219i Infrastructurii pentru realizarea obiectivelor prev\u0103zute \u00een Strategia de dezvoltare a infrastructurii feroviare 2026-2030.<\/p>\n<p id=\"p-1\">Potrivit Guvernului, documentul asigur\u0103 cadrul necesar finan\u021b\u0103rii de la bugetul de stat, astfel \u00eenc\u00e2t s\u0103 fie men\u021binut echilibrul dintre veniturile \u0219i cheltuielile administratorului infrastructurii feroviare. Totodat\u0103, sunt stabilite reguli privind monitorizarea \u0219i evaluarea activit\u0103\u021bii CFR SA, pe baza unor indicatori de performan\u021b\u0103.<\/p>\n<p id=\"p-2\">\u201eNecesarul de finan\u021bare pentru administrarea infrastructurii feroviare a fost stabilit \u00een conformitate cu metodologia de calcul elaborat\u0103 pe baza Strategiei de dezvoltare a infrastructurii feroviare 2026\u20132030 \u0219i a legisla\u021biei incidente\u201d, precizeaz\u0103 Guvernul.<\/p>\n<p id=\"p-3\">Noul contract continu\u0103 cadrul contractual aferent perioadei 2021-2025 \u0219i urm\u0103re\u0219te s\u0103 asigure predictibilitatea financiar\u0103 \u0219i opera\u021bional\u0103 necesar\u0103 activit\u0103\u021bii administratorului infrastructurii feroviare.<\/p>\n<p id=\"p-4\">Executivul subliniaz\u0103 c\u0103 adoptarea hot\u0103r\u00e2rii este necesar\u0103 pentru punerea \u00een aplicare a prevederilor Legii nr. 202\/2016, prin care au fost transpuse \u00een legisla\u021bia na\u021bional\u0103 prevederile Directivei 2012\/34\/UE privind instituirea spa\u021biului feroviar unic european.<\/p>\n<p id=\"p-5\">Potrivit Guvernului, lipsa unui nou \u201e Contract de activitate \u0219i performan\u021b\u0103 ar putea conduce la blocarea aloc\u0103rilor financiare destinate CFR SA \u0219i, implicit, la afectarea activit\u0103\u021bii companiei, cu consecin\u021be negative asupra administr\u0103rii infrastructurii \u0219i asupra continuit\u0103\u021bii serviciilor de transport feroviar\u201d.<\/p>\n<p id=\"p-6\">Prin aprobarea contractului pentru perioada 2026-2030, Executivul urm\u0103re\u0219te s\u0103 asigure continuitatea finan\u021b\u0103rii infrastructurii feroviare, s\u0103 creasc\u0103 nivelul de performan\u021b\u0103 al CFR SA \u0219i s\u0103 eficientizeze utilizarea resurselor publice.<\/p>\n<p id=\"p-7\">Documentul consolideaz\u0103 \u0219i mecanismele de monitorizare \u0219i evaluare a activit\u0103\u021bii companiei, cu obiectivul de a \u00eembun\u0103t\u0103\u021bi performan\u021ba infrastructurii feroviare \u0219i de a crea condi\u021biile necesare dezvolt\u0103rii transportului feroviar \u00een Rom\u00e2nia.<\/p>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Contractul stabile\u0219te obliga\u021biile asumate de CFR SA \u0219i de Ministerul Transporturilor \u0219i Infrastructurii pentru realizarea obiectivelor prev\u0103zute \u00een Strategia de dezvoltare a infrastructurii feroviare 2026-2030. Potrivit Guvernului, documentul asigur\u0103 cadrul &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=709153\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":709154,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/709153"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=709153"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/709153\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/709154"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=709153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=709153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=709153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}