{"id":709219,"date":"2026-08-20T17:36:04","date_gmt":"2026-08-20T17:36:04","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=709219"},"modified":"2026-08-20T17:36:04","modified_gmt":"2026-08-20T17:36:04","slug":"transelectrica-capacitatile-de-productie-si-stocare-a-energiei-electrice-nou-conectate-la-retea-in-2026-au-depasit-pragul-de-2-500-mw-cate-sunt-asteptate-pana-la-finalul-anului","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=709219","title":{"rendered":"Transelectrica: Capacit\u0103\u021bile de produc\u021bie \u0219i stocare a energiei electrice nou conectate la re\u021bea \u00een 2026 au dep\u0103\u0219it pragul de 2.500 MW. C\u00e2te sunt a\u0219teptate p\u00e2n\u0103 la finalul anului"},"content":{"rendered":"<div class=\"sgb-google-buttons\">\n<div class=\"display-flex justify-center google-logo\"><img decoding=\"async\" loading=\"lazy\" class=\"mg-x-auto\" width=\"30\" height=\"30\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/08\/transelectrica-capacitatile-de-productie-si-stocare-a-energiei-electrice-nou-conectate-la-retea-in-2026-au-depasit-pragul-de-2-500-mw-cate-sunt-asteptate-pana-la-finalul-anului.png\" alt><\/div>\n<\/p><\/div>\n<p id=\"p-0\">Borna de 2.500 MW a fost dep\u0103\u0219it\u0103 joi odat\u0103 cu conectarea la re\u021bea a unei noi instala\u021bii de stocare \u2013 IS P\u0103r\u0103u \u2013 cu o capacitate de 76,76 MW \/ 150,288 MWh, arat\u0103 oficialii Translectrica.<\/p>\n<p id=\"p-1\">Capacit\u0103\u021bile sunt conectate at\u00e2t la Re\u021beaua Electric\u0103 de Transport (RET), c\u00e2t \u0219i la re\u021belele electrice de distribu\u021bie \u0219i se afl\u0103 \u00een diferite etape: de la capacit\u0103\u021bi care de\u021bin deja licen\u021b\u0103 de exploatare comercial\u0103 p\u00e2n\u0103 la instala\u021bii aflate \u00een etapa testelor func\u021bionale interne \u0219i a testelor de conformitate.<\/p>\n<blockquote readability=\"11\">\n<p id=\"p-2\">\u201eConectarea acestor capacit\u0103\u021bi reprezint\u0103 rezultatul unui efort sus\u021binut al operatorilor de transport \u0219i distribu\u021bie, al\u0103turi de investitori \u0219i dezvoltatori, \u00eentr-un context \u00een care integrarea rapid\u0103 a noilor surse de produc\u021bie \u0219i a capacit\u0103\u021bilor de stocare are un rol fundamental pentru consolidarea securit\u0103\u021bii energetice \u0219i pentru cre\u0219terea flexibilit\u0103\u021bii SEN\u201d, precizeaz\u0103 oficialii Transelectrica.<\/p>\n<\/blockquote>\n<p id=\"p-3\">Rom\u00e2nia este \u00een <a href=\"https:\/\/www.mediafax.ro\/economic\/consumul-de-energie-a-depasit-usor-nivelul-prognozat-in-ultimele-zile-iar-estimarile-sunt-de-crestere-pana-spre-finalul-anului-in-ce-saptamana-este-asteptat-varful-de-consum-23793023\">stare de alert\u0103 energetic\u0103<\/a>, din 1 august, dup\u0103 oprirea primului reactor de la Cernavod\u0103 (700 MW), din cauza debitelor foarte sc\u0103zute ale Dun\u0103rii, care au dus \u0219i la \u00eenjum\u0103t\u0103\u021birea produc\u021biei celor dou\u0103 hidrocentrale de pe fluviu de la intrarea \u00een \u021bar\u0103, cu o cot\u0103 de 10-15% din totalul generat la nivel multianual. Pe 13 august a fost oprit \u0219i al doilea reactor al centralei care asigur\u0103, \u00een condi\u021bii normale de func\u021bionare, aproximativ 20% din produc\u021bia na\u021bional\u0103 de energie.<\/p>\n<h2 id=\"chapter-0\">Structura noilor capacit\u0103\u021bi<\/h2>\n<p id=\"p-4\">Capacit\u0103\u021bile care au dep\u0103\u0219it pragul de 2.500 MW includ at\u00e2t noi centrale de produc\u021bie a energiei electrice, c\u00e2t \u0219i instala\u021bii de stocare, contribuind la diversificarea mixului energetic \u0219i la cre\u0219terea resurselor disponibile pentru func\u021bionarea SEN.<\/p>\n<p id=\"p-5\">Structura pe tipuri de resurs\u0103 a capacit\u0103\u021bilor instalate \u00een anul 2026, respectiv un total de 2.514 MW, este urm\u0103toarea:<\/p>\n<ul>\n<li>Hidrocarburi \u2013 20 MW<\/li>\n<li>Eolian \u2013 496 MW<\/li>\n<li>Instala\u021bii stocare \u2013 663 MW<\/li>\n<li>Fotovoltaic \u2013 1331 MW<\/li>\n<li>Biogaz \u2013 5 MW<\/li>\n<\/ul>\n<p id=\"p-6\">\u201e\u00cen actualul context energetic, caracterizat de necesitatea men\u021binerii echilibrului \u00eentre produc\u021bie \u0219i consum \u0219i de integrarea unui volum tot mai mare de capacit\u0103\u021bi de produc\u021bie din surse regenerabile, stocarea energiei joac\u0103 un rol important pentru flexibilizarea sistemului \u0219i pentru valorificarea produc\u021biei de energie regenerabile\u201d, au transmis responsabilii Transectrica, ce are sub umbrela sa Dispecerul Energetic Na\u021bional (DEN).<\/p>\n<p id=\"p-7\">La 1 august 2026, SEN avea la dispozi\u021bie o capacitate total\u0103 de 989 MW \u00een instala\u021bii de stocare, incluz\u00e2nd at\u00e2t instala\u021biile de stocare independente, c\u00e2t \u0219i capacit\u0103\u021bile de stocare integrate \u00een centrale electrice mixte.<\/p>\n<p id=\"p-8\">Potrivit estim\u0103rilor Transelectrica, procesul de racordare \u0219i conectare la SEN a noilor capacit\u0103\u021bi va continua \u00eentr-un ritm sus\u021binut \u0219i \u00een perioada urm\u0103toare, cu implicarea \u0219i suportul tuturor exper\u021bilor din cadrul Transelectrica, dar \u0219i din cadrul operatorilor de distribu\u021bie, \u00eencep\u00e2nd de la etapa de preg\u0103tire a procesului de racordare, p\u00e2n\u0103 la conectarea la SEN \u0219i opera\u021bionalizarea instala\u021biilor.<\/p>\n<blockquote readability=\"11\">\n<p id=\"p-9\">\u201eP\u00e2n\u0103 la sf\u00e2r\u0219itul anului 2026 se estimeaz\u0103 ca vor fi conectate la re\u021bea noi capacit\u0103\u021bi de aproximativ 1.000 MW \u00een centrale electrice fotovoltaice \u0219i eoliene, aproximativ 1.000 MW \u00een instala\u021bii de stocare, la care se adaug\u0103 capacit\u0103\u021bile de produc\u021bie pe gaze naturale din centralele de la Mintia \u0219i Iernut\u201d, potrivit sursei citate.<\/p>\n<\/blockquote>\n<p id=\"p-10\">Centrala electric\u0103 pe gaz \u00een ciclu combinat de la Mintia, o investi\u021bie privat\u0103, va avea la final <a href=\"https:\/\/www.mediafax.ro\/economic\/primul-megawatt-de-la-centrala-de-la-mintia-este-asteptat-sa-intre-sistemul-energetic-national-saptamana-viitoare-surse-23755090\">o capacitate instalat\u0103 de 1.700 MW<\/a> \u0219i va juca un rol strategic \u00een consolidarea securit\u0103\u021bii energetice a Rom\u00e2niei. Pentru a avea un ordin de m\u0103rime, centrala de la Mintia are o capacitate instalat\u0103 de peste ceea ce produc \u00eempreun\u0103 cele dou\u0103 reactoare nucleare de la Cernavod\u0103 (1.400 MW). Acesta va fi cea cel mai mare consumator de din \u021bar\u0103, dar \u0219i cea mai mare unitate de produc\u021bie de energie pe gaze din \u00eentreaga Uniune European\u0103. Centrala de la Iernut, dezvoltat\u0103 de Romgaz, are o capacitate instalat\u0103 de 430 MW.<\/p>\n<blockquote readability=\"13\">\n<p id=\"p-11\">\u201eCre\u0219terea capacit\u0103\u021bilor de produc\u021bie \u0219i stocare disponibile \u00een SEN este important\u0103 at\u00e2t pentru acoperirea consumului intern, c\u00e2t \u0219i pentru asigurarea flexibilit\u0103\u021bii necesare SEN. Transelectrica trateaz\u0103 cu prioritate procesul de racordare \u0219i integrare \u00een SEN \u00een condi\u021bii de siguran\u021b\u0103 a noilor capacit\u0103\u021bi, \u00een str\u00e2ns\u0103 colaborare cu operatorii de distribu\u021bie, investitorii, dezvoltatorii \u0219i autorit\u0103\u021bile competente\u201d, potrivit Transelectrica.<\/p>\n<\/blockquote>\n<p id=\"p-12\">Potrivit oficialilor, compania, cotrolat\u0103 de statul rom\u00e2n, prin Seretariatul de stat al Guvernului, implementeaz\u0103 constant proiecte de investi\u021bii pentru dezvoltarea infrastructurii de transport, care vor contribui la integrarea noilor capacit\u0103\u021bi de produc\u021bie \u0219i stocare.<\/p>\n<p id=\"p-13\">Pentru urm\u0103torii 10 ani, Transelectrica are un plan de dezvoltare a RET cu o valoare de peste 2 miliarde de euro \u0219i, astfel, contribuie la cre\u0219terea rezilien\u021bei SEN, consolidarea securit\u0103\u021bii energetice \u0219i preg\u0103tirea \u0219i modelarea Sistemului Electroenergetic Na\u021bional pentru un mix energetic cu o pondere tot mai mare a surselor regenerabile, au conchis oficialii.<\/p>\n<p id=\"p-14\">&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Borna de 2.500 MW a fost dep\u0103\u0219it\u0103 joi odat\u0103 cu conectarea la re\u021bea a unei noi instala\u021bii de stocare \u2013 IS P\u0103r\u0103u \u2013 cu o capacitate de 76,76 MW \/ &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=709219\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":709220,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/709219"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=709219"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/709219\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/709220"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=709219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=709219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=709219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}