{"id":713149,"date":"2026-09-14T09:17:03","date_gmt":"2026-09-14T09:17:03","guid":{"rendered":"https:\/\/microscopemedia.com\/?p=713149"},"modified":"2026-09-14T09:17:03","modified_gmt":"2026-09-14T09:17:03","slug":"mipe-absorbtia-pnrr-este-estimata-la-peste-90-pentru-granturi-si-95-pentru-imprumuturi","status":"publish","type":"post","link":"https:\/\/microscopemedia.com\/?p=713149","title":{"rendered":"MIPE: Absorb\u021bia PNRR este estimat\u0103 la peste 90% pentru granturi \u0219i 95% pentru \u00eemprumuturi"},"content":{"rendered":"<div readability=\"49.713605712019\">\n<div class=\"sgb-google-buttons\">\n<div class=\"display-flex justify-center google-logo\"><img decoding=\"async\" loading=\"lazy\" class=\"mg-x-auto\" width=\"30\" height=\"30\" src=\"https:\/\/microscopemedia.com\/wp-content\/uploads\/2026\/09\/mipe-absorbtia-pnrr-este-estimata-la-peste-90-pentru-granturi-si-95-pentru-imprumuturi.png\" alt><\/div>\n<\/p><\/div>\n<p id=\"p-0\">Ministerul Investi\u021biilor \u0219i Proiectelor Europene (MIPE) anun\u021b\u0103 c\u0103 rezultatele finale privind implementarea Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) vor putea fi cuantificate dup\u0103 transmiterea c\u0103tre Comisia European\u0103 a cererii de plat\u0103 num\u0103rul 6.<\/p>\n<p id=\"p-1\">Aceasta va fi ultima cerere de plat\u0103, iar MIPE va include \u00een document informa\u021biile raportate de coordonatorii de reforme \u0219i investi\u021bii p\u00e2n\u0103 la data de 15 septembrie 2026.<\/p>\n<p id=\"p-2\">Pe baza acestor raport\u0103ri, ministerul va putea actualiza \u0219i Tabloul de bord PNRR, instrumentul prin care sunt prezentate public informa\u021bii privind implementarea Planului.<\/p>\n<p id=\"p-3\">MIPE precizeaz\u0103 c\u0103 datele disponibile \u00een prezent \u00een Tabloul de bord reflect\u0103 situa\u021bia proiectelor PNRR pe baza raport\u0103rilor coordonatorilor de reforme \u0219i investi\u021bii aferente primului semestru din 2026.<\/p>\n<p id=\"p-4\">Institu\u021biile responsabile de coordonarea \u0219i implementarea PNRR \u00ee\u0219i concentreaz\u0103 \u00een aceast\u0103 perioad\u0103 eforturile asupra finaliz\u0103rii procedurilor administrative pentru \u00eenchiderea cererii de plat\u0103 num\u0103rul 5 \u0219i depunerea cererii de plat\u0103 num\u0103rul 6.<\/p>\n<p id=\"p-5\">Ministerul subliniaz\u0103 c\u0103 rezultatele finale privind nivelul de implementare al fiec\u0103rui proiect vor putea fi stabilite doar dup\u0103 \u00eencheierea tuturor etapelor administrative.<\/p>\n<h2 id=\"chapter-0\">Peste 90% absorb\u021bie pentru granturi<\/h2>\n<p id=\"p-6\">Potrivit informa\u021biilor preliminare furnizate de coordonatorii de reforme \u0219i investi\u021bii, gradul de absorb\u021bie a fondurilor PNRR este estimat la peste 90% pentru granturi \u0219i la peste 95% pentru \u00eemprumuturi.<\/p>\n<p id=\"p-7\">\u00cen urma ultimei renegocieri cu serviciile Comisiei Europene, desf\u0103\u0219urat\u0103 \u00een august 2026, alocarea total\u0103 a Rom\u00e2niei prin PNRR este de 20,11 miliarde de euro.<\/p>\n<p id=\"p-8\">Din aceast\u0103 sum\u0103, 13,57 miliarde de euro reprezint\u0103 granturi, iar 6,54 miliarde de euro sunt \u00eemprumuturi.<\/p>\n<p id=\"p-9\">PNRR este implementat prin intermediul a 20 de coordonatori de reforme \u0219i investi\u021bii, respectiv ministere \u0219i alte autorit\u0103\u021bi publice centrale. MIPE are rolul de a coordona la nivel na\u021bional implementarea Planului.<\/p>\n<p id=\"p-10\">Ministerul precizeaz\u0103 c\u0103 nivelul final de implementare \u0219i absorb\u021bie va putea fi evaluat dup\u0103 finalizarea procedurilor aferente ultimei cereri de plat\u0103 \u0219i dup\u0103 analiza informa\u021biilor transmise Comisiei Europene.<\/p>\n<p id=\"p-11\">&nbsp;<\/p>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Ministerul Investi\u021biilor \u0219i Proiectelor Europene (MIPE) anun\u021b\u0103 c\u0103 rezultatele finale privind implementarea Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR) vor putea fi cuantificate dup\u0103 transmiterea c\u0103tre Comisia European\u0103 a cererii &hellip; <a href=\"https:\/\/microscopemedia.com\/?p=713149\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":713150,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/713149"}],"collection":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=713149"}],"version-history":[{"count":0,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/posts\/713149\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=\/wp\/v2\/media\/713150"}],"wp:attachment":[{"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=713149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=713149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microscopemedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=713149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}